Metal Garage Kits
Home/Metal Garage Kits
Customizable Prefab Metal Garage Kits
- MOQ: 100 square meters
- Price: USD30-80 Square Meter/Negotiable
- Standard Packaging: Steel pallet
- Delivery Period: 10-55 days
- Payment Method: L/C, T/T
- Supply Capacity: 15000 tons per month
Products Description
1. Widely used: It can be applied to factories, warehouses, office buildings, gymnasiums, Metal Garage Kits, etc. It is suitable for both single-story large-span buildings and multi-story or high-rise buildings.
2. Simple construction, short construction period: All components are prefabricated in the factory, and only simple assembly is required on site, thus greatly shortening the construction cycle, a building of 6000 square meters can be basically installed in 40 days.
3. Durable and easy to maintain: The steel structure building designed by general computer can resist harsh weather and only needs simple maintenance.
4. Aesthetic and practical: The steel building has simple and smooth lines and a modern feel. Colored wall panels are available in a variety of colors and other materials can be used for the walls, thus providing more flexibility.
5. Reasonable cost: Steel structure building is light in weight, reducing the cost of foundation, fast in construction, and can be put into operation as soon as possible, and the comprehensive economic benefits are much better than concrete structure building.
How much does it cost to build a Metal Garage ?
Raw Materials
Raw materials are a major factor in the cost of steel structure warehouse construction.
Steel and plates are the main components of steel buildings, accounting for approximately 70%-80% of the total construction cost. Therefore, fluctuations in the market price of steel raw materials directly affect the cost of steel warehouse construction.
In addition, the prices of different steel profiles and supporting surfaces, as well as the material and thickness of the enclosure panels, also vary significantly.
Geological Conditions
The cost of the foundation is closely related to the geological conditions of the steel structure building.
When designing a steel building, attention should be paid to the geological report of the location of the steel building to select a reasonable basic type.
Controlling the loading surface and depth of the foundation has a positive effect on the total cost of construction.
Height And Span
Height and span are also important factors in the cost of a steel building. In addition, if your prefabricated steel structure warehouse is considering the installation of a bridge crane, the price will also vary.
In short, the exact cost depends on the use of your prefabricated steel building and the height-to-span ratio.
Complexity Of The Structure
The complexity of the structure also affects the construction cost of steel buildings in China.
The more complex the structure, the higher the requirements for design solutions and technology, and therefore, the higher the construction cost of industrial steel buildings.
GLOBAL PROFESSIONAL
STEEL STRUCTURE MANUFACTURER
Factory production workshop
PACKING & DELIVERY
Normal the goods will be shipped by use 40’ open top container and 40’ HQ container. If use 40’HQ, it need to do a steel pallet to pack the goods, then the whole pallet cargo will be pushed into container together, when you unload the goods, you wold pull the whole pallet out of the container. In this case, the ocean freight will be cheaper, but will increase the cost of pallet. Regarding the open top containers, all the goods will be loaded one by one. In this case, the sea freight of 40’OT is higher than 40’HQ, but The steel pallet for 40’HQ need to be charged. You can tell me your prefer.